Google, Microsoft, Amazon, and Meta have all made the same public, audited, shareholder-binding promise: 100 % carbon-free electricity, matched hourly (24/7 CFE), everywhere they operate, by 2030.

That promise just killed the old way of buying renewables.

How Corporate Renewable Buying Worked for the Last 15 Years

(The Standard PPA + RECs Model — now officially dead)

1. Physical or Virtual PPA A data center operator signs a 10–20-year contract to buy power from a specific wind or solar farm at a fixed price ($25–$45/MWh).

2. The Renewable Energy Certificate (REC) is born For every 1 MWh (1,000 kWh) the wind/solar farm actually produces, it mints one REC. Think of a REC as a digital birth certificate that says: "This megawatt-hour was generated by renewable energy at this exact plant on this exact date."

3. The electrons and the RECs are immediately separated The actual electrons go into the grid and get used by whoever is closest (often a coal plant's customer). The REC is stripped off and sold separately — sometimes to the same buyer, sometimes to a totally different company in another state.

4. The buyer claims "100 % renewable" Even though their servers ran on coal at 2 a.m., they retire the RECs and tell shareholders, regulators, and customers: "We bought an equal amount of renewable energy, so we are 100 % green."

This is called annual matching and it was perfectly legal and accepted from ~2008–2023.

Why RECs + Annual Matching Are No Longer Good Enough

Issue with the Old ModelWhat Changed in 2024–2025
RECs have no time stamp24/7 requires proof the renewable MWh happened in the same hour
RECs can be from Texas while the server is in VirginiaNew rules (Google, Microsoft, EU) require geographic matching
One California solar REC can "greenwash" Iowa coalInvestors and regulators now call this greenwashing
Supply is unlimited (any new wind farm anywhere)Supply of hourly-matched clean electrons is physically capped
Result: the price of a plain, unbundled REC collapsed from $8–$15 in 2022 to <$1 in many regions in 2025. Nobody serious believes they are real anymore.

The New Requirement: Hourly, Granular, Auditable Certificates

Hyperscalers now need something much stronger than a REC:

Old REC (dead)New Required Certificate (2025–2030)
No hour stamp1–60 minute timestamp required
No location proofMust be in same grid region (or adjacent) as the data center
No proof the buyer actually caused additionalityMust be "additional" (new project) + causally linked
Can be bought years laterMust be retired in real time or near-real time
Price → <$1/MWhPrice → $50–$250+/MWh (whatever it takes)
These new certificates don't have an official name yet. People call them:
  • Granular Energy Certificates (GECs)
  • Time-matched RECs
  • 24/7 CFE certificates
  • Or simply "synthetic firm tokens"

Whatever the label, they are created exactly the same way the Bitcoin miners and Powerwall fleets are already creating proof-of-curtailment and proof-of-injection receipts.

The Market Prices Tell the Story

Type of Certificate (2025 real deals)Price PaidMultiple vs Old REC
Plain unbundled REC (Texas wind)$0.50–$1.50
Hourly-matched wind + battery bundle (ERCOT)$90–$140100×+
Miner + battery "synthetic firm" bundle (IREN/Hut 8)$160–$220200×+
Tesla VPP fleet hourly certificate (California)$180–$280250×+
Hyperscalers are already paying 100–250× premiums for the new kind — and supply is still tiny.

The Bottom Line

RECs were the training wheels of corporate clean energy. They are now training wheels with a flat tire.

The only thing that satisfies a 2030 24/7 pledge is an auditable, time-stamped, location-matched token backed by real dispatch logs from batteries, demand-response, miners, or home Powerwalls.

And the richest companies on earth are willing to pay whatever it costs to get them.

The grid is becoming the new global balance sheet. The only open question is who becomes its custodian.